Moorabool Wind Farm

PROJECT OWNER: GOLD WIND

PROJECT DURATION: APRIL 2018 - FEBRUARY 2019

Project Info:

The Moorabool Wind Farm Project will result in up to 1,000,000 MWh of renewable electricity being generated. This is enough renewable energy to power the equivalent of 200,000 average Victorian homes annually, approximately 9% of Victorian households.

The Moorabool Wind Farm will connect to Victoria’s electricity network at the Elaine Terminal Station via a new overhead 132kV powerline.

PLP was engaged in the construction of the 132kV transmission line, including supply, installation and commissioning.