Dugald River Mine Connection

PROJECT OWNER: MMG LIMITED

PROJECT DURATION: JUNE 2016 - MARCH 2017

Project Info:

MMG is based in Melbourne, Australia and listed on the Hong Kong Stock Exchange and Australian Securities Exchange. It operates and develops copper, zinc and other base metal projects across Australia, the Democratic Republic of the Congo, Laos and Peru. Dugald River is one of the world’s highest-grade known zinc deposits.

The package of work involves the design and construction of a 220kV transmission line, using helicopter stringing methods. The line covers a distance of 63.4 km and extends from the existing Ergon Energy Chumvale substation to the Dugald River Mine site.